Scope of works

  • Site clearance including demolition.
  • Topsoil strip
  • Bulk earthworks
  • Lime & cement stabilisation
  • Sub-base importation and placement
  • Topsoiling
  • Section 278 works

Project Description

Peddimore is a major industrial development in Sutton Coldfield, Birmingham, with approximately 2.6 million square feet of warehouse space available once completed.

The total area of the site is around 195 acres, which needed to be cut and filled to achieve the desired levels for future use and development. During the peak season on-site, we were able to excavate circa 50,000m3 per week which enabled us to progress quickly and hand over areas to our client to enable the next stage of planned works to commence.

We utilised some of the largest machinery available to us, including our CAT 637K Scrapers, new additions to our fleet in the summer of 2021. These scrapers were the perfect tool for the job at Peddimore which consisted of a large area with overhead cables spanning through the site.