Project

Hewlett Packard, Bracknell

Duration:Project Contractor:
Duration: 2021 – 2022 Project Contractor: McLaren Construction
Client:Value:
Client: NDA Value: £1.5m
Home | Projects | Hewlett Packard, Bracknell

Project Statistics

Site_Area_Length_Icon

0m2

Site area length
Bulk_Cut_Fill_Icon

0m3

Bulk cut/fill
Scope of works

  • Site clearance
  • Strip out
  • Demolition of existing structures
  • Asbestos removal
  • Disposal of contaminated material
  • Break out and removal of relic structures and foundations
  • Bulk earthworks
  • Crushing and processing of site materials

Project Description

Collins Demolition secured a significant project to clear the former Hewlett Packard head quarters in Bracknell. The demolition is in preparation of an earthworks package secured by Collins Earthworks. Two members of the group working in unison to reduce program and deliver a finished pre-construction enabling package to the client.