Southern Relief Road, Grantham

Duration:Project Contractor:
Duration: 2021 – 2023 Project Contractor: Galliford Try
Client:Value:
Client: Lincolnshire County Council Value: £13m
Home | Projects | Southern Relief Road, Grantham

Project Statistics

Site_Area_Length_Icon

0m2

Site area length
Bulk_Cut_Fill_Icon

0m3

Bulk cut/fill
Aggregate_Import_Icon

0T

Aggregate import
Scope of works

  • Site clearance
  • Compound installation
  • Topsoil strip
  • Bulk excavation
  • Dig & replace
  • Rock break out & crushing – 250,000 m3
  • Abutment backfill
  • Installation of geogrids and Membranes
  • Final trim to sub-base

Project Description

We are currently working on Phase 3 of the Grantham Bypass scheme for Galliford Try.

The final phase of the relief road will link the A52 at Somerby Hill to the B1174, crossing the Witham Valley, River Witham and East Coast railway line over a new viaduct. When opened, the whole Grantham Southern Relief Road will stretch for 3.5km, linking the A52 at Somerby Hill to the A1.

As part of our early contractor involvement, we have been able to develop value-engineered solutions to minimise the volume of material required for processing. These strategies involved constructing the initial embankment core out of the upper-class 2C material along with alterations to the embankment specification for the proposed ‘allotment’ location meaning unprocessed material could be engineered as general fill material.