Project
Amazon, Poole
Duration: | Project Contractor: |
---|---|
Duration: 2020 – 2022 | Project Contractor: TSL |
Client: | Value: |
Client: Amazon | Value: £2m |
Project Statistics
0m2
Site area length0m3
Bulk cut/fill0T
Aggregate importProject Description
Located at Hoyles Bay, adjacent to the English Channel, Amazon Poole provided some challenging ground conditions for EnviroTrac. The site had been untouched for many years and consisted of heavily saturated and weathered material all of which required to be stabilised using a mix of lime and cementitious binders to meet earthworks specifications and geotechnical performance criteria.
Despite the challenging ground conditions, we were able to stabilise existing material to meet performance specifications alongside being completed on time and within budget.