Project

Amazon, Poole

Duration:Project Contractor:
Duration: 2020 – 2022 Project Contractor: TSL
Client:Value:
Client: Amazon Value: £2m
Home | Projects | Amazon, Poole

Project Statistics

Site_Area_Length_Icon

0m2

Site area length
Bulk_Cut_Fill_Icon

0m3

Bulk cut/fill
Aggregate_Import_Icon

0T

Aggregate import
Scope of works

  • Site clearance
  • Bulk earthworks
  • Bulk modification and stabilisation
  • Lime & cement stabilisation
  • Capping importation
  • Sub-base importation

Project Description

Located at Hoyles Bay, adjacent to the English Channel, Amazon Poole provided some challenging ground conditions for EnviroTrac. The site had been untouched for many years and consisted of heavily saturated and weathered material all of which required to be stabilised using a mix of lime and cementitious binders to meet earthworks specifications and geotechnical performance criteria.

Despite the challenging ground conditions, we were able to stabilise existing material to meet performance specifications alongside being completed on time and within budget.